Scotsman CMS1202R Manuale di Servizio Pagina 5

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 27
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 4
FOR THE INSTALLER: Remote Condenser
Locate the condenser as near as possible to
the interior location of the ice maker.
Location of the condenser is limited by the specific
length of precharged refrigerant tubing supplied for
the application. The pre-charged tubing connects
the icemaker to the remote condenser. The
condenser must be above the ice maker.
Select the best available location, protecting the
condenser from extremes of dirt, dust, and sun.
Meet all applicable building codes.
Roof Attachment:
Install and attach the remote condenser unit to the
roof of the building, using the methods and
practices of construction that conform to the local
building codes, including having a roofing
contractor secure the condenser to the roof.
Precharged Line Routing
/////////////////////////////CAUTION///////////////////////////////
Do not connect precharged tubing until all routing
and forming of the tubing is complete. See the
coupling instructions for connecting instructions.
////////////////////////////////////////////////////////////////////////////
1. Each set of precharged refrigerant lines consists
of a 3/8 inch diameter liquid line, and a 1/2 inch
diameter discharge line. Both ends of each line
have quick connect couplings, the end without
access valves goes to the icemaker.
Note: The openings in the building ceiling or wall,
listed in the next step, are the minimum sizes
recommended for passing the refrigerant lines
through.
REFRIGERANT
CONNECTIONS
TYPICAL
INSTALLATION
LOCATE CONDENSER
NO LOWER THAN ICE
MACHINE
2. Have the roofing contractor cut a
minimum hole for the refrigerant lines of
1.75". Check local codes, a separate
hole may be required for the electrical
power to the condenser.
/////////////////////////////CAUTION/////////////////////
///////////
DO NOT KINK OR CRIMP
REFRIGERANT TUBING WHEN
INSTALLING IT.
//////////////////////////////////////////////////////////////////
//////////
3. Route the refrigerant lines through
the roof opening.
Follow straight line routing whenever
possible.
Any excess tubing MUST be retained
within the building.
4. Spiral any excess length of pre
charged tubing inside the building. Use
a horizontal spiral (as illustrated) to
avoid any traps in the lines.
5. Have the roofing contractor seal the
holes in the roof per local codes.
CMS1202R
September 1993
Page 5
Vedere la pagina 4
1 2 3 4 5 6 7 8 9 10 ... 26 27

Commenti su questo manuale

Nessun commento

Ge-industrial-solutions Remote Racking Operator: Low Voltage AKR Circuit B manuals

Owner’s manuals and user’s guides for Equipment Ge-industrial-solutions Remote Racking Operator: Low Voltage AKR Circuit B.
We providing 1 pdf manuals Ge-industrial-solutions Remote Racking Operator: Low Voltage AKR Circuit B for download free by document types: User Manual






More products and manuals for Equipment Ge-industrial-solutions

Models Document Type
AF-600 FP Fan and Pump Drive (460V_575V 150HP and User Manual   GE Industrial Solutions AF-600 FP Fan and Pump Drive (460V_575V 150HP and above) User Manual, 175 pages
A Series Lighting Control Panelboards DB25 Connect User Manual   GE Industrial Solutions A Series Lighting Control Panelboards DB25 Connector cable User Manual [en] [es] [fr] , 1 pages
POWER LEADER ModBus Monitor User Manual   GE Industrial Solutions POWER LEADER ModBus Monitor User Manual, 68 pages
Double-Throw Safety Switch, NEMA 3R User Manual   GE Industrial Solutions Double-Throw Safety Switch, NEMA 3R User Manual, 2 pages
Power-Vac ML-20 Mechanism User Manual   GE Industrial Solutions Power-Vac ML-20 Mechanism User Manual, 40 pages
Spectra K-Frame MCCB with microEntelliGuard trip u User Manual   GE Industrial Solutions Spectra K-Frame MCCB with microEntelliGuard trip unit User Manual, 8 pages
Record Plus FG600 with SMR1 or SMR2 Trip Unit User Manual   GE Industrial Solutions Record Plus FG600 with SMR1 or SMR2 Trip Unit User Manual, 8 pages
ZNET901 User Manual   GE Industrial Solutions ZNET901 User Manual [en] [es] [fr] , 10 pages
EQW010-040 Series (Eighth-Brick) User Manual   GE Industrial Solutions EQW010-040 Series (Eighth-Brick) User Manual, 28 pages
Spectra Series ACT Transient-Voltage User Manual   GE Industrial Solutions Spectra Series ACT Transient-Voltage User Manual, 4 pages
ZBTE Series User Manual   GE Industrial Solutions ZBTE Series User Manual [en] [es] [fr] , 20 pages
Control System Toolbox For AV-300, DV-300, AV-300i User Manual   GE Industrial Solutions Control System Toolbox For AV-300, DV-300, AV-300i (AVDV Series) Drives User Manual [en] , 82 pages
Record Plus Cable Operating Mechanism: FC100, FE25 User Manual   GE Industrial Solutions Record Plus Cable Operating Mechanism: FC100, FE250 User Manual [en] , 8 pages
Cable Operator Mechanisms for Thermal-Magnetic E15 User Manual   GE Industrial Solutions Cable Operator Mechanisms for Thermal-Magnetic E150 and Spectra SE150, SF250, and SG600 MCCBs User Manual [en] [es] [fr] , 6 pages
CLP0212 User Manual   GE Industrial Solutions CLP0212 User Manual, 15 pages
DCPower User Manual   GE Industrial Solutions DCPower User Manual [en] [es] [fr] , 1 pages
Austin Lynx II 12V SIP User Manual   GE Industrial Solutions Austin Lynx II 12V SIP User Manual [en] [es] [fr] , 19 pages
ProTrip Conversion Kits K-225, K-600, K-800, K-160 User Manual   GE Industrial Solutions ProTrip Conversion Kits K-225, K-600, K-800, K-1600 User Manual, 24 pages
AF-600 FP Panel Through Mount Kit User Manual   GE Industrial Solutions AF-600 FP Panel Through Mount Kit User Manual, 12 pages
EntelliGuard G Envelope 3, drawout, For 6000A UL _ User Manual   GE Industrial Solutions EntelliGuard G Envelope 3, drawout, For 6000A UL _ 5000A ANSI User Manual [en] , 2 pages